Qualifier Value
Qualifier values of 5249 in D13A
Percentage basis identification code (an1..3)
Code specifying the basis on which a percentage is calculated.
| Code | Description | 
|---|---|
| 1 | 
            Per unit             Referenced percentage applies on a single unit basis.  | 
        
| 2 | 
            Per ton             Reduction percentage is applied per transported ton.  | 
        
| 3 | 
            Per equipment unit             Reduction percentage is applied per main equipment unit (for rail purpose, only rail wagons).  | 
        
| 4 | 
            Per unit price             Reduction percentage is applied on the unit price, which is the basis of the charge calculation.  | 
        
| 5 | 
            Per quantity             Reduction percentage applied on the unit price and conceded to a consignor after he reached a specified tonnage of transport.  | 
        
| 6 | 
            Basic charge             Code to indicate that the IATA experimental special charge within Europe is the basis for the percentage reduction or surcharge.  | 
        
| 7 | 
            Rate per kilogram             Code to indicate that the IATA experimental special rate within in Europe is the basis for the percentage reduction or surcharge.  | 
        
| 8 | 
            Minimum charge             Code to indicate that the IATA minimum charge is the basis for the percentage reduction or surcharge.  | 
        
| 9 | 
            Normal rate             Code to indicate that the IATA normal rate is the basis for the percentage reduction or surcharge.  | 
        
| 10 | 
            Quantity rate             Code to indicate that the IATA quantity rate is the basis for the percentage reduction or surcharge.  | 
        
| 11 | 
            Amount of drawing             Referenced percentage applies on the amount of drawing under the documentary credit.  | 
        
| 12 | 
            Documentary credit amount             Referenced percentage applies on documentary credit amount.  | 
        
| 13 | 
            Invoice value             Referenced percentage applies on the invoice value.  | 
        
| 14 | 
            CIF value             Referenced percentage applies on CIF value.  | 
        
| 15 | 
            Contract cost             The percentage applied to the contract cost.  | 
        
| 16 | 
            Labour hours             The percentage applied to the labour hours.  | 
        
| 17 | 
            LIBOR (London Inter-Bank Offered Rate)             The percentage basis is London Inter-Bank Offered Rate (LIBOR).  | 
        
| 18 | 
            FIBOR (Frankfurt Inter-Bank Offered Rate)             The percentage basis is Frankfurt Inter-Bank Offered Rate (FIBOR).  | 
        
| 19 | 
            PIBOR (Paris Inter-Bank Offered Rate)             The percentage basis is Paris Inter-Bank Offered Rate (PIBOR).  | 
        
| 20 | 
            Nationally based percentage basis             The percentage basis is nationally based.  |